Power

Buckingham Heavy Transport rolls a transformer from a barge

Transformer Barge Roll-Off

Case HighlightsFor this first in a series of transformer deliveries, Buckingham Heavy Transport met the barge delivering the transformer at dockside. The crew set 40-foot Buckingham barge ramps, then drove 12 lines of Goldhofer onto the barge and under the transformer. After securing the transformer on the trailer, they rolled it off the barge and

Transformer Barge Roll-Off Read More »

Buckingham Transport hauling transformer on yellow Goldhofer trailer

100-Mile Overland Transformer Transport

Case HighlightsBuckingham Heavy Transport completed a complex 100-mile transport from port to substation, delivering a 305,782-lb transformer safely to its pad. Since the unit was too wide to be brought close to the site by rail, Buckingham coordinated a multi-stage transport plan using specialized hauling configurations to comply with permitting and infrastructure restrictions.   After loading

100-Mile Overland Transformer Transport Read More »

Transformer Transport with Dual Lane Trailer

Case HighlightsThe 37-mile transport route for this 370,000-lb transformer presented multiple challenges, including more than 200 overhead wires, multiple narrow streets, and tight corners. Buckingham’s detailed route planning, swept path analysis, and on-the-ground expertise enabled us to safely complete the delivery while minimizing disruptions to traffic flow and surrounding infrastructure. Client SatisfactionDespite delays caused by

Transformer Transport with Dual Lane Trailer Read More »

Delivery of Wind Farm Components

Case HighlightsBuckingham Heavy Transport provided the permitting, personnel, and specialized equipment for the transport of multiple nacelles and drivetrains to a new wind farm. The oversized components were transported over mountainous terrain and through varied route conditions that required detailed planning and precise execution. Buckingham’s diverse fleet allowed the team to match each load with

Delivery of Wind Farm Components Read More »

Transformer Transport & Tip-up

Case HighlightsBuckingham Heavy Transport’s range of equipment facilitated the safe delivery of this 360,000-lb transformer into a tight location, eliminating crane deployment fees for the client. After installing jacking brackets, our crew used the Buckingham jack & slide system to transload the transformer from a railcar to 6 lines of Goldhofer E-steer trailer. They transported

Transformer Transport & Tip-up Read More »

Wind Turbine Blade Transport

Case HighlightsBuckingham Heavy Transport contracted to move two 272-ft-long, 130,000-lb wind turbine blades on site at a testing facility. Buckingham moved the first turbine blade from inside the testing facility into the yard, then moved the second one from the yard back into the testing facility, using two custom dolly transporters driven by the Buckingham

Wind Turbine Blade Transport Read More »

Winter Delivery Of Multiple Transformers

Case HighlightsBuckingham Heavy Transport utilized a combination of Goldhofer trailers and Buckingham equipment to deliver multiple transformers to a new substation. The team successfully coordinated the equipment and personnel to navigate the winter terrain and the 100-mile route, delivering the transformers safely to their pads. Client SatisfactionBuckingham’s expert project management allowed us to successfully coordinate

Winter Delivery Of Multiple Transformers Read More »