Case Highlights
Buckingham Heavy Transport contracted to move two 272-ft-long, 130,000-lb wind turbine blades on site at a testing facility. Buckingham moved the first turbine blade from inside the testing facility into the yard, then moved the second one from the yard back into the testing facility, using two custom dolly transporters driven by the Buckingham SmartSteer® System.
Client Satisfaction
Our custom equipment allowed us to configure a dolly arrangement precisely suited to the tight constraints of the testing area.
Equipment Used
- Buckingham Power and Coaster Dollies
- BU-29 Power Unit
- Buckingham SmartSteer® System