Delivery of Wind Farm Components

Case Highlights
Buckingham Heavy Transport provided the permitting, personnel, and specialized equipment for the transport of multiple nacelles and drivetrains to a new wind farm. The oversized components were transported over mountainous terrain and through varied route conditions that required detailed planning and precise execution. Buckingham’s diverse fleet allowed the team to match each load with the most suitable trailer configuration, ensuring optimal weight distribution and safety parameters for transport. 

Client Satisfaction
The multi-month project required close coordination with the client, ongoing scheduling adjustments, and seamless integration of equipment and crews to keep components arriving in sequence for installation. Buckingham’s careful handling of the project facilitated its efficient and timely completion. 

Equipment Used

  • Goldhofer 10-line DC (Dual-Lane) w/ Gooseneck
  • Goldhofer 12-line ADDrive SPMT
          w/ 3-Meter Spacer Deck
  • Goldhofer STZ-9 Extendable 13-axle Trailer
  • 8×8 Oshkosh Prime Mover

Browse Our Projects

Ready to get started?

Experience seamless transportation with precise planning and reliable delivery.

Scroll to Top