Underhook to Storage Transport of Six Generators

Case Highlights
Buckingham Heavy Transport successfully completed the underhook-to-storage transport of six industrial generators. The project began shipside, where the gensets were offloaded by crane to Buckingham’s 12-line Goldhofer SPMTs. The SPMTs provided the maneuverability and necessary load capacity to safety transport the 334,000-lb generators through the port.   

At the storage site, Buckingham had pre-positioned custom-fabricated can stands and beam mats designed to support the generators’ significant weight. The Buckingham crew drove the SPMTs between the stands, where the gensets were lowered to final position. The transporters were then removed, leaving the generators securely staged for storage. 

Client Satisfaction
The client selected Buckingham based on our ability to provide a fully integrated solution, including our specialized fleet, in-house fabrication capabilities, and established working relationships within the port. The project was executed safely, efficiently, and without delay, earning high marks from the client for both technical expertise and operational coordination. 

Equipment Used

  • 12-line Goldhofer SPMTs
  • Buckingham Can Stands