Case Highlights
Buckingham Heavy Transport delivered a 48-foot-long, 246,410-pound forging shaft to the plant using an 8-line Goldhofer dual-lane trailer. The project required detailed planning to ensure safe transport of the superload, with equipment configured to meet weight and width requirements.
Client Satisfaction
Buckingham’s experienced project management team and field crew contributed to an on-time, incident-free delivery to the client.
Equipment Used
- 8-Line Goldhofer Dual Lane Trailer
- Kenworth W990