Industrial Platen Replacement

Case HighlightsBuckingham Heavy Transport completed the removal and replacement of a 48,000-lb platen in an active industrial facility. The project scope included staging Buckingham stands to support the new platen, installing additional stands and beams in the pit beneath the existing platen, and setting up 100 feet of Buckingham jack and slide system with a […]

Industrial Platen Replacement Read More »

Industrial Gantry Lift

Case HighlightsBuckingham Heavy Transport deployed our 500-ton gantry system to a manufacturing plant to lift a 238,634-lb compressor and load it onto a trailer for transport. Buckingham’s team set up the gantry within the confined interior space, safely lifted the compressor, and loaded it the large heavy-haul trailer. Client SatisfactionBuckingham’s adaptive equipment and efficient team

Industrial Gantry Lift Read More »

Transformer Transport & Tip-up

Case HighlightsBuckingham Heavy Transport’s range of equipment facilitated the safe delivery of this 360,000-lb transformer into a tight location, eliminating crane deployment fees for the client. After installing jacking brackets, our crew used the Buckingham jack & slide system to transload the transformer from a railcar to 6 lines of Goldhofer E-steer trailer. They transported

Transformer Transport & Tip-up Read More »

I-476 Bridge Replacement

Case HighlightsBuckingham Heavy Transport positioned an 80′ x 72′ bridge section as part of an Accelerated Bridge Construction (ABC) project on the Pennsylvania Turnpike. The new bridge was constructed on temporary steel abutments adjacent to the existing structure. Following the demolition of the old bridge, our team used 100-ton jacks paired with unified jacking machines

I-476 Bridge Replacement Read More »