Industrial

Compressor and Cask Transport

Case HighlightsBuckingham Heavy Transport completed transport of a compressor and inner bundle cask from the manufacturing facility to a barge on the Allegheny River, executing a complex, multi-stage heavy haul operation that required specialized equipment, extensive route planning, and coordinated transloads at both the origin and destination. The project involved transporting a 291,100-lb inner bundle container and […]

Compressor and Cask Transport Read More »

Preassembled Lumber Sorter Placement

Case HighlightsBuckingham Heavy Transport’s premium equipment and decades of experience moving oversized structures were key in helping our client minimize plant downtime during a routine equipment replacement. Rather than build and install a new lumber sorter in sections—a process that typically takes a couple of weeks—Buckingham devised a solution to move the 1,200,000-lb sorter as

Preassembled Lumber Sorter Placement Read More »

Industrial Platen Replacement

Case HighlightsBuckingham Heavy Transport completed the removal and replacement of a 48,000-lb platen in an active industrial facility. The project scope included staging Buckingham stands to support the new platen, installing additional stands and beams in the pit beneath the existing platen, and setting up 100 feet of Buckingham jack and slide system with a

Industrial Platen Replacement Read More »

Cold Box Trio Transport

Case HighlightsBuckingham Heavy Transport delivered three cold boxes from the manufacturer to their destination over 600 miles down the eastern seaboard. The largest of the cold boxes measured 105’x18’x11’ and weighed 238,900 pounds. Buckingham’s versatile trailer fleet was ideal for this move, allowing us to match trailers for the permitting requirements of the different loads

Cold Box Trio Transport Read More »

Industrial Gantry Lift

Case HighlightsBuckingham Heavy Transport deployed our 500-ton gantry system to a manufacturing plant to lift a 238,634-lb compressor and load it onto a trailer for transport. Buckingham’s team set up the gantry within the confined interior space, safely lifted the compressor, and loaded it the large heavy-haul trailer. Client SatisfactionBuckingham’s adaptive equipment and efficient team

Industrial Gantry Lift Read More »

Forging Shaft Superload Transport

Case HighlightsBuckingham Heavy Transport delivered a 48-foot-long, 246,410-pound forging shaft to the plant using an 8-line Goldhofer dual-lane trailer. The project required detailed planning to ensure safe transport of the superload, with equipment configured to meet weight and width requirements.  Client SatisfactionBuckingham’s experienced project management team and field crew contributed to an on-time, incident-free delivery

Forging Shaft Superload Transport Read More »